Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBA800
Site visits
30-07-2023
Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha
Melbourne
DOWNLOAD DATA
ME_EBA800 Bunyip River Catchment
Sunday 30th July 2023 12:30pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
78.71
%
Dissolved Oxygen mg/L
8.6
mg/L
Electrical Conductivity
1415
µS/cm
pH
7.23
pH Units
Reactive Phosphate (mg/L)
0.005
mg/L P
Temperature - AIR
13.1
° C
Temperature - WATER
11.2
° C
Turbidity - NTU
1
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stained brown,Muddy
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
04-06-2023
30-07-2023
06-08-2023
→
Modal title