Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
01-09-2023
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Friday 1st September 2023 11:50am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
90.4
%
Dissolved Oxygen mg/L
9.51
mg/L
Electrical Conductivity
1171
µS/cm
pH
6.5
pH Units
Temperature - WATER
13
° C
Turbidity - NTU
41
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last week
8.00
Flow estimate
Water Appearance
Stream depth
1m - 2m
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
18-07-2023
01-09-2023
10-11-2023
→
Modal title