Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EBA800
Site visits
26-09-2023
Balcombe Creek at the footbridge as it exits The Briar's Park, Mt Martha
Melbourne
DOWNLOAD DATA
ME_EBA800 Bunyip River Catchment
Tuesday 26th September 2023 16:45pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
81.45
%
Dissolved Oxygen mg/L
8.5
mg/L
Electrical Conductivity
1612
µS/cm
pH
7.97
pH Units
Reactive Phosphate (mg/L)
0.06
mg/L P
Temperature - AIR
16.9
° C
Temperature - WATER
13.2
° C
Turbidity - NTU
1
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Foamy/frothy,Stained brown
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-08-2023
26-09-2023
08-10-2023
→
Modal title