Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Loddon River Catchment
NC_BUL180
Site visits
04-06-2024
Bullock Creek: Upper Spring Ck Landcare, B10
North Central
DOWNLOAD DATA
NC_BUL180 Loddon River Catchment
Tuesday 4th June 2024 10:55am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1980
µS/cm
pH
7
pH Units
Reactive Phosphate (mg/L)
0.25
mg/L P
Temperature - AIR
8
° C
Temperature - WATER
7
° C
Turbidity - NTU
24
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
24.00
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Scummy,Stained green
Stream depth
0 - 50cm
Stream width
< 2m
Hazards
wet stony creek base
Litter/Pollutants
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
04-05-2024
04-06-2024
03-08-2024
→
Modal title