Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_EMU955
Site visits
30-09-2023
Emu creek near corner Sullivans Rd & Dukes Lane
North Central
DOWNLOAD DATA
NC_EMU955 Campaspe River Catchment
Saturday 30th September 2023 12:00pm
Approved
Notes
Physical Chemical Tests
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - AIR
24.8
° C
Temperature - WATER
18
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Sunny
Last rainfall
More than a week ago
Flow estimate
STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Other:10.5
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
31-08-2023
30-09-2023
31-10-2023
→
Modal title