Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Loddon River Catchment
NC_BGO028
Site visits
28-07-2025
Bendigo Creek Weeroona Ave
North Central
DOWNLOAD DATA
NC_BGO028 Loddon River Catchment
Monday 28th July 2025 14:20pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1112
µS/cm
pH
7.7
pH Units
Reactive Phosphate (mg/L)
0.067
mg/L P
Temperature - AIR
12.9
° C
Temperature - WATER
15
° C
Turbidity - NTU
50
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
14.60
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Clear,Stained brown
Stream depth
51cm - 99cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
bottles,paper,packets,other: Shopping trolley, vape, tent
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
26-05-2025
28-07-2025
25-08-2025
→
Modal title