Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_KPC012
Site visits
22-04-2012
King Parrot Creek at Flowerdale downstream of Moores Bridge.
Goulburn-Broken
DOWNLOAD DATA
GB_KPC012 Goulburn River Catchment
Sunday 22nd April 2012 13:30pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
89
%
Dissolved Oxygen mg/L
8.4
mg/L
Electrical Conductivity
92
µS/cm
pH
6.8
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
15.7
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
3.1
NTU
Water Conditions
Weather
Overcast
Last rainfall
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
20-03-2012
22-04-2012
16-04-2013
→
Modal title