Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Campaspe River Catchment
NC_FMC380
Site visits
23-06-2012
Five Mile Creek Reserve
North Central
DOWNLOAD DATA
NC_FMC380 Campaspe River Catchment
Saturday 23rd June 2012 16:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
270
µS/cm
pH
6.5
pH Units
Reactive Phosphate (mg/L)
0.03
mg/L P
Temperature - AIR
7
° C
Temperature - WATER
6.2
° C
Turbidity - NTU
28
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
60
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Muddy
Stream depth
1m - 2m
Stream width
2m - 5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
13-05-2012
23-06-2012
19-08-2012
→
Modal title