Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA300
Site visits
28-06-2012
Warringine Creek downstream of Frankston-Flinders/Watts Rd
Melbourne
DOWNLOAD DATA
ME_EWA300 Bunyip River Catchment
Thursday 28th June 2012 15:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1000
µS/cm
pH
6.8
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
11
° C
Temperature - WATER
7.5
° C
Turbidity - NTU
15
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Clear
Stream depth
0.50
Stream width
3
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
10-04-2012
28-06-2012
28-07-2012
→
Modal title