Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA071
Site visits
28-07-2012
Warringine Creek in paddock at Carpenters Lane North
Melbourne
DOWNLOAD DATA
ME_EWA071 Bunyip River Catchment
Saturday 28th July 2012 14:30pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1006
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.25
mg/L P
Temperature - AIR
11
° C
Temperature - WATER
9.5
° C
Turbidity - NTU
20
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Clear
Stream depth
0.30
Stream width
2
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
28-06-2012
28-07-2012
28-08-2012
→
Modal title