Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_WDF670
Site visits
13-08-2012
Ducks Foot Lagoon - Site 5
Mallee
DOWNLOAD DATA
MA_WDF670 Mallee Catchment
Monday 13th August 2012 17:05pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
126.1
µS/cm
pH
7.3
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - WATER
14.5
° C
Turbidity - NTU
50
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
1
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
21-07-2012
13-08-2012
21-10-2012
→
Modal title