Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_EWW100
Site visits
08-09-2012
Horseshoe pump site - Site 2
Mallee
DOWNLOAD DATA
MA_EWW100 Mallee Catchment
Saturday 8th September 2012 10:45am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
140
µS/cm
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.03
mg/L P
Temperature - WATER
13.8
° C
Turbidity - NTU
88
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last week
Flow estimate
BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Milky
Stream depth
>2m
Stream width
>5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
06-07-2012
08-09-2012
→
Modal title