Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_LBT007
Site visits
10-07-2012
Lake Bartlett near outlet at North End
Goulburn-Broken
DOWNLOAD DATA
GB_LBT007 Goulburn River Catchment
Tuesday 10th July 2012 14:20pm
Approved
Notes
Physical Chemical Tests
Chemical Oxygen Demand
11
mg/L
Dissolved Oxygen % Saturation
88
%
Dissolved Oxygen mg/L
9.9
mg/L
E coli
167
orgs/100mL
Electrical Conductivity
209
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - WATER
9.2
° C
Total Coliforms
2419
orgs/100mL
Total Phosphorus
0.05
mg/L
Turbidity - NTU
39
NTU
Water Conditions
Weather
Raining
Last rainfall
Raining Now
11.2
Flow estimate
PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
12-06-2012
10-07-2012
13-08-2012
→
Modal title