Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_SUG020
Site visits
19-12-2012
Sugarloaf Creek at ford in Ashes Bridge Road
Goulburn-Broken
DOWNLOAD DATA
GB_SUG020 Goulburn River Catchment
Wednesday 19th December 2012 9:15am
Approved
Notes
Physical Chemical Tests
E coli
4
orgs/100mL
Electrical Conductivity
1080
µS/cm
pH
7.4
pH Units
Rainfall last 48 hours
0
mm
Temperature - AIR
21.1
° C
Temperature - WATER
22.4
° C
Total Coliforms
2420
orgs/100mL
Turbidity - NTU
9.5
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
21-11-2012
19-12-2012
14-01-2013
→
Modal title