Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_RMU541
Site visits
02-12-2012
River Murray at Pump Hill boat ramp
Mallee
DOWNLOAD DATA
MA_RMU541 Mallee Catchment
Sunday 2nd December 2012 9:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
157
µS/cm
pH
7.57
pH Units
Reactive Phosphate (mg/L)
0.1
mg/L P
Temperature - WATER
22.9
° C
Turbidity - NTU
40
NTU
Water Conditions
Weather
Last rainfall
During the last week
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
03-11-2012
02-12-2012
13-01-2013
→
Modal title