Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA071
Site visits
02-11-2012
Warringine Creek in paddock at Carpenters Lane North
Melbourne
DOWNLOAD DATA
ME_EWA071 Bunyip River Catchment
Friday 2nd November 2012 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
2390
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.07
mg/L P
Temperature - AIR
24
° C
Temperature - WATER
15
° C
Turbidity - NTU
12
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0.1
Stream width
0.4
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
28-08-2012
02-11-2012
04-12-2012
→
Modal title