Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YDP037
Site visits
11-01-2013
Damper Creek, Eastern branch, below Alvie Hall carpark, 30 metres above confluence with main creek.
Melbourne
DOWNLOAD DATA
ME_YDP037 Yarra River Catchment
Friday 11th January 2013 10:30am
Approved
Notes
Physical Chemical Tests
Ammonium
0.3
mg/L NH4+
Dissolved Oxygen mg/L
0.35
mg/L
Electrical Conductivity
2500
µS/cm
pH
7.3
pH Units
Temperature - AIR
27
° C
Temperature - WATER
18
° C
Turbidity - NTU
12
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
3.4
Flow estimate
POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
bottles,cans,packets,paper,other
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
12-05-2012
11-01-2013
12-04-2013
→
Modal title