Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_HON010
Site visits
22-03-2013
Honeysuckle Creek Upstream of Violet Town on Hayes Road
Goulburn-Broken
DOWNLOAD DATA
GB_HON010 Goulburn River Catchment
Friday 22nd March 2013 11:40am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
88
%
Dissolved Oxygen mg/L
8.7
mg/L
Electrical Conductivity
236
µS/cm
pH
6.7
pH Units
Rainfall last 48 hours
64
mm
Temperature - WATER
16.4
° C
Total Phosphorus
0.41
mg/L
Turbidity - NTU
342
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-03-2013
22-03-2013
25-03-2013
→
Modal title