Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_GOU017
Site visits
14-01-2013
Goulburn River before Alexandra at the Breakaway Bridge
Goulburn-Broken
DOWNLOAD DATA
GB_GOU017 Goulburn River Catchment
Monday 14th January 2013 15:10pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
92
%
Dissolved Oxygen mg/L
9.3
mg/L
Electrical Conductivity
41
µS/cm
pH
6.3
pH Units
Temperature - WATER
13.2
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
6.2
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
14-12-2012
14-01-2013
27-02-2013
→
Modal title