Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA070
Site visits
02-11-2012
Warringine Creek tributary at 5 Carpenters Lane North spring in paddock
Melbourne
DOWNLOAD DATA
ME_EWA070 Bunyip River Catchment
Friday 2nd November 2012 12:00pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
3220
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - AIR
24
° C
Temperature - WATER
17
° C
Turbidity - NTU
5
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0 - 50cm
Stream width
1.0
Hazards
nil
Litter/Pollutants
other
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
10-04-2012
02-11-2012
18-02-2017
→
Modal title