Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA060
Site visits
04-12-2012
Warringine Creek at Carpenters Lane North Bridge
Melbourne
DOWNLOAD DATA
ME_EWA060 Bunyip River Catchment
Tuesday 4th December 2012 1:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
3210
µS/cm
pH
8.4
pH Units
Reactive Phosphate (mg/L)
0.05
mg/L P
Temperature - AIR
19
° C
Temperature - WATER
16
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Cloudy
Last rainfall
More than a week ago
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0.025
Stream width
0.5
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
02-11-2012
04-12-2012
11-07-2014
→
Modal title