Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EDV250
Site visits
05-05-2013
Devilbend Reservoir at water supply pipe, accessed from Hodgins Rd
Melbourne
DOWNLOAD DATA
ME_EDV250 Bunyip River Catchment
Sunday 5th May 2013 10:30am
Approved
Notes
Physical Chemical Tests
Ammonium
0.3
mg/L NH4+
Dissolved Oxygen mg/L
7
mg/L
Electrical Conductivity
889
µS/cm
Nitrate - Nitrogen
0
mg/L N
pH
8.2
pH Units
Reactive Phosphate (mg/L)
0.02
mg/L P
Temperature - AIR
14.2
° C
Temperature - WATER
13
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last 24 hours
5
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stained brown
Stream depth
0 - 50cm
Stream width
200
Hazards
Litter/Pollutants
other
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
21-02-2013
05-05-2013
→
Modal title