Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_SUG020
Site visits
22-07-2013
Sugarloaf Creek at ford in Ashes Bridge Road
Goulburn-Broken
DOWNLOAD DATA
GB_SUG020 Goulburn River Catchment
Monday 22nd July 2013 9:15am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
590
µS/cm
pH
7.3
pH Units
Rainfall last 48 hours
8.4
mm
Temperature - AIR
7.2
° C
Temperature - WATER
8.5
° C
Turbidity - NTU
264
NTU
Water Conditions
Weather
Cloudy
Last rainfall
During the last week
45.2
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Muddy
Stream depth
>2m
Stream width
>5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
20-06-2013
22-07-2013
26-08-2013
→
Modal title