Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_YEA008
Site visits
26-08-2013
Yea River behind Hotel at Glenburn.
Goulburn-Broken
DOWNLOAD DATA
GB_YEA008 Goulburn River Catchment
Monday 26th August 2013 14:30pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
102
%
Dissolved Oxygen mg/L
10.7
mg/L
Electrical Conductivity
92
µS/cm
pH
7.1
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
11.5
° C
Total Phosphorus
0.04
mg/L
Turbidity - NTU
25
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-08-2013
26-08-2013
01-09-2013
→
Modal title