Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Lake King Catchment
EG_JOB056
Site visits
25-09-2013
Jones Bay 'The Cut
East Gippsland
DOWNLOAD DATA
EG_JOB056 Lake King Catchment
Wednesday 25th September 2013 10:30am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
89.6
%
Dissolved Oxygen mg/L
7.65
mg/L
Electrical Conductivity
1582
µS/cm
pH
8.7
pH Units
Reactive Phosphate (mg/L)
0.007
mg/L P
Temperature - AIR
24.9
° C
Temperature - WATER
23.8
° C
Turbidity - NTU
1
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
Flow estimate
Water Appearance
Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
bottles,packets,paper,plastic
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
24-08-2013
25-09-2013
20-12-2013
→
Modal title