Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_SUG020
Site visits
16-12-2013
Sugarloaf Creek at ford in Ashes Bridge Road
Goulburn-Broken
DOWNLOAD DATA
GB_SUG020 Goulburn River Catchment
Monday 16th December 2013 9:20am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
980
µS/cm
pH
7.6
pH Units
Rainfall last 48 hours
0
mm
Temperature - AIR
17.7
° C
Temperature - WATER
18.2
° C
Turbidity - NTU
7.1
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
0
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear,Foamy/frothy
Stream depth
Stream width
>5m
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
18-11-2013
16-12-2013
24-02-2014
→
Modal title