Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_PFO600
Site visits
09-11-2013
Foster Street Settling pond rehabilitation site 2
Mallee
DOWNLOAD DATA
MA_PFO600 Mallee Catchment
Saturday 9th November 2013 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
479
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.8
mg/L P
Temperature - WATER
14.5
° C
Turbidity - NTU
17
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
05-10-2013
09-11-2013
08-12-2013
→
Modal title