Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_WCP003
Site visits
08-08-2013
Cussen Park Site 3 - Weir Wall, downstream
Goulburn-Broken
DOWNLOAD DATA
GB_WCP003 Goulburn River Catchment
Thursday 8th August 2013 13:20pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
63
%
Dissolved Oxygen mg/L
6.9
mg/L
Electrical Conductivity
170
µS/cm
pH
7.2
pH Units
Temperature - WATER
10.4
° C
Turbidity - NTU
149
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
26.8
Flow estimate
PERMANENT: wetlands and lakes
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Chemical Oxygen Demand
E coli
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
17-06-2013
08-08-2013
24-09-2013
→
Modal title