Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_HOL020
Site visits
26-09-2013
Holland Creek at Sherwills Bridge Benalla
Goulburn-Broken
DOWNLOAD DATA
GB_HOL020 Broken River Catchment
Thursday 26th September 2013 14:45pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
83
%
Dissolved Oxygen mg/L
8.4
mg/L
Electrical Conductivity
87
µS/cm
pH
7.3
pH Units
Rainfall last 48 hours
2.6
mm
Temperature - WATER
15.8
° C
Total Phosphorus
0.03
mg/L
Turbidity - NTU
29
NTU
Water Conditions
Weather
Last rainfall
2.6
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
05-09-2013
26-09-2013
15-10-2013
→
Modal title