Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_WWI002
Site visits
31-10-2013
Winton Wetlands at Boggy Creek Bridge
Goulburn-Broken
DOWNLOAD DATA
GB_WWI002 Broken River Catchment
Thursday 31st October 2013 11:30am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
85
%
Dissolved Oxygen mg/L
7.1
mg/L
Electrical Conductivity
331
µS/cm
pH
7.8
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
21.9
° C
Total Phosphorus
0.15
mg/L
Turbidity - NTU
124
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
26-09-2013
31-10-2013
12-12-2013
→
Modal title