Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_SUG020
Site visits
15-09-2014
Sugarloaf Creek at ford in Ashes Bridge Road
Goulburn-Broken
DOWNLOAD DATA
GB_SUG020 Goulburn River Catchment
Monday 15th September 2014 9:15am
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
76
%
Dissolved Oxygen mg/L
8.3
mg/L
E coli
144
orgs/100mL
Electrical Conductivity
590
µS/cm
pH
7.4
pH Units
Rainfall last 48 hours
0
mm
Temperature - AIR
12.2
° C
Temperature - WATER
12
° C
Total Coliforms
2420
orgs/100mL
Turbidity - NTU
225
NTU
Water Conditions
Weather
Last rainfall
During the last week
16.2
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Muddy,Foamy/frothy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
E coli
Dissolved Oxygen mg/L
Rainfall last 48 hours
Total Coliforms
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
18-08-2014
15-09-2014
03-10-2014
→
Modal title