Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YYD809
Site visits
20-03-2015
Chelsworth Overflow (stormwater capture draining to Reedy Billabong)
Melbourne
DOWNLOAD DATA
ME_YYD809 Yarra River Catchment
Friday 20th March 2015 9:20am
Approved
Notes
Physical Chemical Tests
Ammonia-Nitrogen
0.19
mg/L NH3-N
Dissolved Oxygen mg/L
6.6
mg/L
Electrical Conductivity
290
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.11
mg/L P
Temperature - AIR
19
° C
Temperature - WATER
17
° C
Turbidity - NTU
9
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
2
Flow estimate
STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance
Clear
Stream depth
0.2
Stream width
1
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - FTU
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
19-02-2015
20-03-2015
17-04-2015
→
Modal title