Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Broken River Catchment
GB_BRO085
Site visits
20-05-2015
Broken River at Archer Street
Goulburn-Broken
DOWNLOAD DATA
GB_BRO085 Broken River Catchment
Wednesday 20th May 2015 14:41pm
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
160
µS/cm
Rainfall last 48 hours
3.2
mm
Temperature - WATER
12.6
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
27
NTU
Water Conditions
Weather
Overcast
Last rainfall
During the last 24 hours
3.2
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Clear,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Nitrate - Nitrogen
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
21-04-2015
20-05-2015
22-06-2015
→
Modal title