Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_ACH013
Site visits
20-04-2015
Acheron River 8 km North of Buxton on Glendale Lane
Goulburn-Broken
DOWNLOAD DATA
GB_ACH013 Goulburn River Catchment
Monday 20th April 2015 14:45pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
100
%
Dissolved Oxygen mg/L
10.5
mg/L
Electrical Conductivity
35
µS/cm
pH
6.6
pH Units
Rainfall last 48 hours
0
mm
Temperature - WATER
11.7
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
9.4
NTU
Water Conditions
Weather
Last rainfall
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
23-02-2015
20-04-2015
18-05-2015
→
Modal title