Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_KPC012
Site visits
18-09-2015
King Parrot Creek at Flowerdale downstream of Moores Bridge.
Goulburn-Broken
DOWNLOAD DATA
GB_KPC012 Goulburn River Catchment
Friday 18th September 2015 13:20pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
108
%
Dissolved Oxygen mg/L
11.4
mg/L
Electrical Conductivity
88
µS/cm
pH
7
pH Units
Rainfall last 48 hours
0.2
mm
Temperature - WATER
12.2
° C
Total Phosphorus
0.02
mg/L
Turbidity - NTU
6.4
NTU
Water Conditions
Weather
Cloudy
Last rainfall
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Rainfall last 48 hours
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
21-08-2015
18-09-2015
24-10-2015
→
Modal title