Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Goulburn River Catchment
GB_STE019
Site visits
05-11-2015
Steavenson River at Buxton River Reserve Platform, Buxton
Goulburn-Broken
DOWNLOAD DATA
GB_STE019 Goulburn River Catchment
Thursday 5th November 2015 14:31pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
94
%
Electrical Conductivity
40
µS/cm
pH
6.4
pH Units
Reactive Phosphate (mg/L)
0
mg/L P
Water Conditions
Weather
Last rainfall
Flow estimate
HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Rainfall last 48 hours
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
30-09-2009
05-11-2015
01-01-2016
→
Modal title