Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Latrobe River Catchment
WG_HRT515
Site visits
24-02-2015
Heart Morass site @ Levee Bank (West side of road)
West Gippsland
DOWNLOAD DATA
WG_HRT515 Latrobe River Catchment
Tuesday 24th February 2015 16:25pm
Approved
Notes
Physical Chemical Tests
Dissolved Oxygen % Saturation
81.5
%
Electrical Conductivity
2069
µS/cm
pH
7
pH Units
Temperature - AIR
20
° C
Temperature - WATER
27.5
° C
Turbidity - NTU
80
NTU
Water Conditions
Weather
Raining
Last rainfall
Raining Now
Flow estimate
POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance
Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Dissolved Oxygen mg/L
Gauge Board Height
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
10-11-2014
24-02-2015
09-11-2015
→
Modal title