Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Mallee Catchment
MA_RMU541
Site visits
05-02-2016
River Murray at Pump Hill boat ramp
Mallee
DOWNLOAD DATA
MA_RMU541 Mallee Catchment
Friday 5th February 2016 9:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
107
µS/cm
pH
7.33
pH Units
Reactive Phosphate (mg/L)
0.25
mg/L P
Temperature - WATER
21.8
° C
Turbidity - NTU
24
NTU
Water Conditions
Weather
Last rainfall
More than a week ago
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Test 2
Temperature - WATER
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Total Phosphorus
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
03-01-2016
05-02-2016
16-03-2016
→
Modal title