Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA071
Site visits
29-11-2014
Warringine Creek in paddock at Carpenters Lane North
Melbourne
DOWNLOAD DATA
ME_EWA071 Bunyip River Catchment
Saturday 29th November 2014 10:00am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1195
µS/cm
pH
7.1
pH Units
Reactive Phosphate (mg/L)
0.5
mg/L P
Temperature - AIR
20
° C
Temperature - WATER
13
° C
Turbidity - NTU
17
NTU
Water Conditions
Weather
Overcast
Last rainfall
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Stream depth
0 - 50cm
Stream width
0.6
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
22-09-2014
29-11-2014
30-03-2015
→
Modal title