Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Bunyip River Catchment
ME_EWA300
Site visits
29-11-2014
Warringine Creek downstream of Frankston-Flinders/Watts Rd
Melbourne
DOWNLOAD DATA
ME_EWA300 Bunyip River Catchment
Saturday 29th November 2014 10:30am
Approved
Notes
Physical Chemical Tests
Electrical Conductivity
1066
µS/cm
pH
7.6
pH Units
Reactive Phosphate (mg/L)
0.1
mg/L P
Temperature - AIR
23
° C
Temperature - WATER
14
° C
Turbidity - NTU
35
NTU
Water Conditions
Weather
Overcast
Last rainfall
Flow estimate
DRY: No continuous flow in channel and no pools
Water Appearance
Stream depth
0 - 50cm
Stream width
1.5
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
22-09-2014
29-11-2014
30-03-2015
→
Modal title