Skip to content
 
WaterWatch Data Portal

Etiwanda Wetlands - end dam MA_WET000

Mallee Mallee Mallee 14_10 Murray River

Site Visit
10-09-2007
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
21 8.6 700 35
20-06-2007
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
11.7 7.8 400 45
08-05-2007
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
22.2 7.5 560 0 35