Skip to content
 
WaterWatch Data Portal

Pump Hut Reserve Wetlands MA_WPH500

Mallee Mallee Mallee

Site Visit
03-11-2008
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
20.4 8 1060 0.01 60
17-10-2008
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
17 8.5 0.01 28
19-09-2008
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
16.4 8.5 420 0.01