Skip to content
 
WaterWatch Data Portal

Spring (Gully) Creek - first footbridge downstream from Cricket Oval & playground NC_SPR170

North Central Loddon River Loddon River Bendigo Creek

Site Visit
15-01-2014
Approved
Physical Chemical
Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
15-12-2013
Approved
Physical Chemical
Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
15-10-2013
Approved
Physical Chemical
Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
07-06-2013
Approved
Physical Chemical
Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
14 11 7.4 60 0.15 30
26-05-2012
Approved
0 Photo(s) Physical Chemical Water Bugs
Water ° C Air ° C pH pH Units EC µS/cm rP mg/L P Turb NTU
13 14 7.3 120 0.1 30