Skip to content
 
WaterWatch Data Portal

Buchan River - Slippery Pinch Pile Field, Site 2, 50m downstream from works site EG_BUC630

East Gippsland Snowy River Snowy River Buchan River 22_11 Buchan River

Site Visit
22-11-2012
Approved
Physical Chemical
Turb NTU
6.36
22-11-2012
Approved
Physical Chemical
Turb NTU
12.35
21-11-2012
Approved
Physical Chemical
Turb NTU
4.57
21-11-2012
Approved
Physical Chemical
Turb NTU
5.59