Skip to content
 
WaterWatch Data Portal

Buchan River - Slippery Pinch Pile Field, Site 1, 20m upstream from start of works EG_BUC620

East Gippsland Snowy River Snowy River Buchan River 22_11 Buchan River

Site Visit
22-11-2012
Approved
Physical Chemical
Turb NTU
5.3
22-11-2012
Approved
Physical Chemical
Turb NTU
3.6
21-11-2012
Approved
Physical Chemical
Turb NTU
4.51
21-11-2012
Approved
Physical Chemical
Turb NTU
21-11-2012
Approved
Physical Chemical
Turb NTU
4.29