Skip to content
 
WaterWatch Data Portal

King Parrot Creek at Tomita Rise MACRO site DS at gate in WILLOWS GB_KPC051

Goulburn-Broken Goulburn River Goulburn River King Parrot Creek 5_51 King Parrot Creek

Site Visit
26-11-2013
Approved
Physical Chemical
D.O mg/L Rain mm Water ° C pH pH Units EC µS/cm P mg/L D.O. % Turb NTU
8.6 0 18.1 6.9 118 0.02 93 11
03-05-2013
Approved
Physical Chemical
D.O mg/L Rain mm Water ° C pH pH Units EC µS/cm P mg/L D.O. % Turb NTU
10.3 10.2 6.8 99 0.04 94 11