North East
DOWNLOAD DATAAt the time of the site assessment there was NO water in the creek! The site has great access for students and is directly opposite the Bright p-12 school. There is a concrete drain located at the site that runs through the culvert on the other side of the road directly into the creek. At the time of the assessment there was no water running from the drain.
Bank Erosion Stability | Bank Vegetation | In Stream Cover | Riffles Pools Bends | Verge Vegetation | Overall |
---|---|---|---|---|---|
Fair 3 | Fair 6 | Fair 6 | Poor 2 | Fair 6 | Fair 23 |