Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
20-07-2017
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Thursday 20th July 2017 10:15am
Approved
Notes
Physical Chemical Tests
Ammonium
0.09
mg/L NH4+
Dissolved Oxygen % Saturation
82
%
Electrical Conductivity
225
µS/cm
pH
8.3
pH Units
Reactive Phosphate (mg/L)
0.09
mg/L P
Temperature - AIR
11.9
° C
Temperature - WATER
12.2
° C
Turbidity - NTU
40
NTU
Water Conditions
Weather
Raining
Last rainfall
Raining now
Flow estimate
MEDIUM: flow is normal/typical average flow
Water Appearance
Other
Stream depth
51cm - 99cm
Stream width
2m - 5m
Hazards
Litter/Pollutants
plastic,packets
Diary photos
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
13-07-2017
20-07-2017
07-07-2018
→
Modal title