Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YFM980
Site visits
13-07-2017
Five Mile Creek, end of Governors Road, Essendon
Melbourne
DOWNLOAD DATA
ME_YFM980 Yarra River Catchment
Thursday 13th July 2017 10:30am
Approved
Notes
Physical Chemical Tests
Ammonium
0.1
mg/L NH4+
Dissolved Oxygen % Saturation
92
%
Electrical Conductivity
200
µS/cm
pH
6.6
pH Units
Reactive Phosphate (mg/L)
0.2
mg/L P
Temperature - AIR
13.4
° C
Temperature - WATER
10.6
° C
Turbidity - NTU
30
NTU
Water Conditions
Weather
Cloudy
Last rainfall
More than a week ago
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Other
Stream depth
Stream width
Hazards
Litter/Pollutants
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonium
Dissolved Oxygen mg/L
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
25-01-2017
13-07-2017
20-07-2017
→
Modal title