Skip to content
WaterWatch Data Portal
Volunteer Login
Find My Waterway
Catchments
Yarra River Catchment
ME_YDA558
Site visits
25-01-2019
Darebin Creek at Darebin Parklands, ford (dog crossing) U/S railway bridge.
Melbourne
DOWNLOAD DATA
ME_YDA558 Yarra River Catchment
Friday 25th January 2019 10:30am
Approved
Notes
Physical Chemical Tests
Ammonium
0.02
mg/L NH4+
Dissolved Oxygen mg/L
6
mg/L
Electrical Conductivity
1380
µS/cm
pH
8.4
pH Units
Reactive Phosphate (mg/L)
0.1
mg/L P
Temperature - AIR
39.1
° C
Temperature - WATER
26.6
° C
Turbidity - NTU
10
NTU
Water Conditions
Weather
Sunny
Last rainfall
During the last week
2.20
Flow estimate
LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance
Clear,Other
Stream depth
0 - 50cm
Stream width
> 5m
Hazards
Very hot temperature
Litter/Pollutants
plastic
Diary photos
No diary entries recorded for this visit
Physical Chemical Trends
Loading chart
Test 1
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Test 2
Ammonia-Nitrogen
Ammonium
Dissolved Oxygen mg/L
Filterable Reactive Phosphorus
Nitrate - Nitrogen
Nitrate NO3
Temperature - WATER
Temperature - AIR
pH
Electrical Conductivity
Reactive Phosphate (mg/L)
Dissolved Oxygen % Saturation
Turbidity - NTU
Mininum standard
Any level
Level 1
Level 2
Level 3
Level 4
Start date
First data:
End date
Last data:
←
07-12-2018
25-01-2019
15-02-2019
→
Modal title